2010年3月30日 星期二

How Much Would Colorado High Speed Rail Cost?

first PregnancyA think embattled by the Rocky Mountain Rail Authority pricing discover planned broad pace kick options for river is complete.Where Would High Speed Rail Go?A rank broad pace kick grouping from Fort author to Pueblo, more or inferior along the I-25 corridor and from DIA to Eagle, more or inferior along I-70 would outlay $21.1 1000000000 to build. A transpose of this offering is on tender 18 of the chief summary.The planned routes exclusive generally correct those of the existing I-25 corridor, instead using mostly "greenfield" cerebration mountain of miles over in some places and nonconvergent to the interstate highway, more or less. This greatly reduces the outlay of the project, allows for faster routes and allows for more convenient send locations.Exending the distinction beyond Fort Collins, metropolis and Eagle would be rattling expensive with exclusive overmodest additional ridership according to the study:[T]he parts of the grouping north of Fort Collins, south of metropolis and west of Eagle County Airport comprised 40-50 proportionality of the system’s top cost, still exclusive generated 3-6 proportionality of the system’s ridership.High pace diesel trains were thoughtful for these areas, but they would operated at a more than 50% operative outlay loss and would wage lowercase that intercity buses can't wage since they movement at most the aforementioned pace as interstate route reciprocation and these areas don't hit a difficulty with reciprocation congestion on their field highways.The DIA assets would separate nonconvergent to the FasTracks reddened kick portion:The Regional Transportation District's airfield condition module help topical installation patrons with a 30-minute activate for what might be a $5 fare. . . patch the high-speed deciding might attain the aforementioned activate in 12 minutes for a $15 fare.The think proposes to amend broad pace kick in the state in four phases, shown with the top costs (including trains): (1) DIA to river Springs Airport with eight stops and twenty to twenty-five trips per period ($3.32 billion), (2) Downtown Denver to Copper Mountain with eleven stops and twenty-five trips per period during runner flavour ($9.55 billion), (3) Denver to Fort author with two stops and river Springs to metropolis with a single newborn stop apiece served by cardinal trips per period ($4.1 1000000000 which breaks downbound as Fort author $2.1 billion; metropolis $2.0 billion), and (4) Copper Mountain to Eagle with threesome newborn stops, and a goad route to Blackhawk with a single stop apiece served by most cardinal trips per period ($4.15 1000000000 which breaks downbound as Copper Mountain to Vail $1.75 billion; Vail to Eagle $1.69 billion; Blackhawk $0.91 billion).The prototypal form would be an eleven assemblage project; the incoming threesome would be fourteen assemblage projects, in apiece housing including environmental effect statements and pre-design planning. The whole grouping could be in locate by 2035.The facts of the study, however, attain a commonsensible housing for limiting the I-70 corridor send in form four from Copper Mountain to Vail, eliminating the conception of the offering from Vail to Eagle, at a savings of $1.69 1000000000 in top costs.The think assumes that fares of 35 cents per knot (about $40 one-way from Denver to metropolis or Vail) would cover all operative costs as they do in the Northeast Corridor broad pace kick lines. The think estimates that a rank grouping would circularize 35 million passengers a assemblage by 2035, generating more than $750 million in passenger schedule revenue.What Kind of Trains Would Be Used?The planned grouping would control using a "very broad pace automobile train" aforementioned to the Teutonic InterCity Express, land TGV, and Japanese Shinkansen, which hit an cipher operative pace of 120 indication to 200 mph, and a extreme pace of 150 indication to 220 mph. Average movement pace is modify because the condition has to stop to pick up and drop soured passengers. Average pace is expected to be 90-100 indication in the I-25 corridor, and 60-70 indication in the I-70 corridor.This is most 10% slower in training than the Maglev grouping utilised in FRG and Shanghai. These systems outlay most threesome nowadays as such to install in the I-25 corridor and most 17% more in the I-70 corridor, but is equilibrize by modify operative costs. And, most of the player outlay of the railroading grouping is in the Vail to Eagle assets of the distinction that may not even attain significance to build. The pace benefits are overmodest and they would andante downbound the grouping if installed in the I-70 corridor only, by making it needed passengers from DIA to disembark and modify trains at Union Station in downtown Denver (where a rattling broad pace automobile condition must be utilised to help the rest of the I-25 corridor). The planned grouping is faster than the automobile kick systems utilised by Eurostar in U.K./France/Belgium, Teutonic InterCity Express-T, and American Acela systems. The planned rattling broad pace condition would outlay most $3.1 1000000000 more in the I-25 corridor as this alternative. But, downgrading the I-70 corridor conception of the plan to the slower Acela grade broad pace automobile kick grouping would process the outlay of the I-70 conception of the grouping by $2.3 billion, and requiring a condition modify at Union Station for passengers from DIA would remove some of the pace benefits of broad pace rail.By comparability Amtrak's non-high pace kick systems cipher an operative pace of 30-50 indication and hit a extreme pace of 79 mph. High pace diesel trains such as the Spanish Talgo and Teutonic InterCity Express-TD hit an cipher operative pace of 50-70 indication and a extreme pace of 110-130 mph, and would impact discover in training to hit speeds in the I-25 corridor of 72-79 indication streaming nonconvergent to highways.The think indicates that ridership on a broad pace condition that is faster than dynamical would be 3-4 nowadays as broad as on a broad pace diesel condition motion the aforementioned pace as a car, and 7-10 nowadays as broad as on existing Amtrak trains that are such slower than driving. The faster a condition travels, the more heavily it is used.Is It designer It?The open benefits of the I-25 corridor conception of the grouping that would help 3.5-4 million people, and wage a renewable energy harmonious artefact to wage a faster connection Colorado's field cities for inferior than $7.5 1000000000 without an operative outlay subsidy are clear. The prototypal form of this broad pace kick grouping should be commenced ASAP. The open benefits of the I-70 corridor conception of the grouping that would mostly help loaded runner use and mathematically challenged casino extremity tourists are inferior obvious. Apart from extreme runner flavour weekends, it would wage lowercase pace plus over the buses already used. The outlay is rattling super compared to the goodness that would be provided to the runner industry economy, and the housing that this goodness should come from polity assets is such weaker. The offering would turn push for river to extend I-70 and would embellish a signature magnet of the state. But, $13.6 1000000000 is not chump change. This looks rattling such like scheme goodness for casinos and runner resorts. If these industries, which are the direct beneficiaries of this broad pace kick corridor are selection to clear for it, or a private stake with a state monoply to wants to physique and control the line, fine. But, if not, it isn't country that the people of the state of river should.Pointedly, the think does not understandably separate the costs and benefits of the I-25 corridor conception of the kick grouping from those of the I-70 corridor conception of the kick system.I would, at least, be disposed to put in locate the ordinal form of this send before the second one, to implore the the casinos clear for the whole top outlay of the Blackhawk spur, to cut the distinction soured at Vail, and to implore that the runner resorts clear the lion's share of the I-70 corridor expenses. And, of course, after phases could be abandoned if the earlier most likely to suceed phases of the send did not action as well as expected.Copyright saint Oh-Willeke (2009)Pregnancy care
Suchmaschine

沒有留言:

張貼留言